Northampton General Hospital NHS Trust

Northampton General Hospital NHS Trust

Emergency department extension and refurbishment

The work completed was at the heart of the hospital site adjacent to the live A&E department. The project was undertaken during the pandemic and completed in 16 weeks on site.  

This scheme was to construct a significant extension to existing Emergency Department, alongside the refurbishment of some existing areas into new treatment space. Comprising a new two-storey Emergency Department expansion of 6800sq ft, the building was connected to the existing structure of the hospital via several newly formed openings which required the breaking through of several new access points into live ED facilities and included some internal re-configuration of the existing building.

The foundations, drainage and services were formed on site, with the new building manufactured concurrently in advance using off-site volumetric construction techniques. Significant site works were required including moving existing temporary fire corridors, closing and re-routing a vehicular access route, alteration of an existing car park and provision of a steel sheet piled retaining wall.

Once foundations were prepared, the volumetric off-site units were transported and lifted into place using night working patterns to alleviate traffic and parking disruption to the hospital, forming the shell of the new building. Once watertight the new openings into the existing hospital were formed and new and old floor spaces fitted out. The works completed in the winter months and just in time for a significant escalation of COVID 19 patient numbers.

What we did | Principal Contractor’s role under Construction (Design & Management) Regulations

During the pre-construction period:

  • production of employer’s requirements documents

  • cost planning and ongoing cost control

  • co-ordination of the design and distribution of design information

  • management of appointed designers

  • programming the works

  • preparation of tender packages 

  • procurement of subcontract packages and placing of orders

Works on site:

  • management of the site, site supervision and health and safety management

  • certification and management of quality

  • monthly valuations of trades packages 

  • progress report and ongoing programming

  • management of setting out of the works

  • taking and holding of records

  • agreement of final trade accounts 

 

Contact.

Contact Us

If you have any queries please submit an enquiry or contact us via mail, e-mail or telephone. Please select the names for individual profile information.

Address:

The Gillow Suite, The Nostell Estate Yard, Nostell,                  Wakefield, WF4 1AB

Office tel: 01924 802290    


Company registration numbers: 

Wordsworth Construction Management Ltd: 11248806      Registered in England